Impact of the reservoir of Paraibuna Hydroelectric Power Plant, SP, Brazil
Keywords:
Database, environment, GIS, Remote Sensing, Geotechnology
Abstract
Artificial reservoirs for hydroelectric power plants cause significant environment and social changes. This paper describes the construction of a geospatial database with information on the impacts caused by the Paraibuna hydroelectric power plant since its construction. CBERS-2 and Landsat 5 and 7 images were included in the database, and then, analyzed to provide information on land cover and land use for a period of 31 years. Information provided by São Paulo Energy Company (CESP) and the Paraíba do Sul Water Basin Management Association (AGEVAP) was integrated into this database. Interactive database queries allow the assessment of changes in the local economy around the reservoir, changes in land cover, loss of historical and environmental assets and also the actions of the energy company to minimize the plant and reservoir impacts. This database provides information that helps analyzing the potential and limits of Paraibuna Power Plant and addresses the impacts to the natural landscape and to the social and economic resources of the affected region.
Published
23/12/2010
Issue
Section
Papers
Authors maintain the copyrights for their work. However, they grant rights of first publication to Ambiente e Agua - An Interdisciplinary Journal of Applied Science. In compensation, the journal can transfer the copyrights, allowing non-commercial use of the article including the right of sending the article to other data bases or publication media. The journal uses the CC BY 4.0 license"